Delivery and assembly

Our company deliveres building structures on the specially equipped panel trailers through the whole Europe and CIS.

Assembly is made by our team in the shortest time. High grade of manufacture makes it possible to assemble 100 sq.m. house within 3 days.

Delivery 

All structures of the house such as wall panels, floor and roof panels passes visual inspection and only after that shall be packed and loaded on the panel trailer.

Assembly

All structures of the house are mounted on the preliminary prepared basement. Wall panels, floor and roof panels are connected together by means special extra strong fasteners into the integrated system. Vapor insulation of the walls and seilings is fastened together by means special adhesive tape.

Finisihing

After the assembly is finished and roof is covered, begins packing of the joints between panels, mounting of the non-standard precast components, mounting of the utilities and internal finishing operations.